GE IS200UCSAH1ABB UCS Controller Board Mark VI

Original price was: $7,980.00.Current price is: $3,115.00.

Parameter Details
Model IS200UCSAH1ABB
Brand General Electric (GE)
Series Mark VI / Mark VIe control hardware family
Core Function Provides embedded control and processing functions for compatible GE turbine-control applications
Product Type Controller / Processor Board
Functional Acronym UCSA
Board Family IS200
Revision H1ABB
Application GE turbine and industrial control systems
Brand: Model/SKU: IS200UCSAH1ABB

Get a Quote / Inquiry

Phone/WhatsApp/Wechat:
WhatsApp QR Code WhatsApp
WeChat QR Code WeChat

Description

Product Introduction & Engineering Value

The GE IS200UCSAH1ABB is a UCSA controller board in GE’s IS200 hardware family. Unlike a terminal or relay board, this type of assembly is part of the control-processing layer, so compatibility depends heavily on the system architecture, software/firmware configuration, and associated I/O hardware.

That distinction matters during procurement. A board can be physically correct yet still require configuration or firmware verification before it can be placed into service. The complete IS200UCSAH1ABB identification should therefore remain attached to the spare-parts record.

 

Technical Specifications

Parameter Specification
Manufacturer General Electric
Part Number IS200UCSAH1ABB
Functional Acronym UCSA
Board Family IS200
Board Type Controller / Processor Board
Primary Role Embedded control processing
Application GE turbine and industrial control
Hardware Revision H1ABB
Control Architecture Configuration-dependent
Software/Firmware Application-dependent
I/O Integration System-dependent
Installation GE control cabinet / controller assembly

Engineering caution

The UCSA should not be specified like a generic PLC CPU. Exact processor, memory, communications, firmware, operating-system, and I/O characteristics should be verified from the documentation for the particular GE control architecture.

For a replacement purchase, the installed board’s label and any firmware/configuration information should be captured before removal.

 

Field Application & the “Trench” Experience

Controller replacements are where “same part number” and “same working system” can become two different things.

Imagine a turbine control cabinet with a failed UCSA controller. The maintenance team has a matching spare on the shelf. The hardware fits. The connectors fit. Power comes on. Then the controller fails to establish normal communication with the rest of the control system.

That is why a controller replacement should begin with configuration capture, not board removal. Record the existing hardware identification, firmware information where accessible, network connections, and application configuration. The spare must be evaluated as part of the complete control system.

Specific application scenarios

  • GE turbine controller replacement following a processor or controller-board failure.
  • Planned control-system maintenance, where a UCSA spare is held for rapid restoration.
  • Legacy GE control-system migration or refurbishment, where hardware revision and application configuration must be tracked together.
IS200UCSAH1ABB

IS200UCSAH1ABB

IS200UCSAH1ABB

IS200UCSAH1ABB

Transparency SOP: QA & Testing

For New Surplus IS200UCSAH1ABB, QA should go beyond cosmetic inspection.

Identification: Verify the complete IS200UCSAH1ABB number from the actual board.

Revision: Record the H1ABB hardware designation.

Physical inspection: Examine connectors, processor-related components, PCB surfaces, mounting points, and solder joints.

Configuration review: Where possible, document firmware/software identifiers and configuration information from the existing controller before replacement.

Power-up testing: Use an appropriate GE test environment rather than connecting an unverified controller directly to a production turbine-control system.

Communication testing: Verify applicable controller communications and I/O interfaces before declaring the board ready for service.

A New Surplus controller should be sold with its condition clearly identified. “Unused” and “tested” are separate claims.

 

The Veteran’s Tech Trap Guide

⚠️ Trap #1 — Treating a controller like a passive PCB

It isn’t. A controller can require the correct firmware, application configuration, network parameters, and system-specific setup.

⚠️ Trap #2 — Losing the configuration during replacement

Before pulling the old board, document everything that can affect commissioning. Network connections and controller configuration are particularly important.

PRO TIP: Keep the failed controller until the replacement is fully commissioned. Do not immediately discard it. Its label, memory/configuration information, and hardware revision may be needed during troubleshooting.

⚠️ Trap #3 — Assuming physical compatibility equals operational compatibility

A matching connector does not guarantee that the board will operate correctly in the target system. Confirm hardware revision, software/firmware requirements, and system architecture.

 

Dynamic FAQ

What is GE IS200UCSAH1ABB?

The is a GE UCSA controller/processor board in the IS200 family, used in compatible GE turbine and industrial control architectures.

Is the UCSA an I/O module?

No. It should be treated as controller/processor hardware rather than a conventional discrete or analog I/O card.

Does a replacement UCSA require configuration?

Potentially, yes. Controller hardware can depend on application software, firmware, configuration data, communication settings, and associated I/O hardware. Verify the requirements for the exact control system before installation.

What should I record before removing the existing board?

Record the complete part number and revision, take photographs of connectors and wiring, and document available firmware, configuration, and communication information. Retain the original controller until commissioning is complete.

How should New Surplus stock be evaluated?

Confirm the actual board’s part number and revision, inspect the PCB and connectors, determine whether the board is unused or previously installed, and request functional-test information where available.

What warranty should I request?

Warranty terms vary by supplier and condition. For controller hardware, request written confirmation of the warranty period, test status, configuration/firmware status, and return provisions before placing the order.